Specification

System specification

Panel class, post section, coating and accessories are confirmed per project drawing. The reference table below is the starting point for a tender specification.

Request project quote
System specification

Panel classes

GS11, GS12 and GS13 denote the panel build within the high-security range. Wire diameters and panel heights are confirmed against the site requirement before quotation.

  • GS11 — high-security welded mesh panel
  • GS12 — high-security welded mesh panel, heavier build
  • GS13 — high-security welded mesh panel, heaviest build
  • 358 / anti-climb, 2D 4/6/4, mesh approx. 76.2 x 12.7 mm

Coating

Hot-dip galvanised to EN ISO 1461 as the specified coating standard, with optional polyester powder coating over galvanising for colour finishes.

Posts, clamps and accessories

Post and fixing sets are supplied with the panels as one package.

  • Square project posts 60 x 80 x 2.5 x 3600 mm
  • Flat bar 60 x 5 clamps
  • Angle 40 x 40 x 4 fixings
  • Security fasteners, post caps and base plates

Toppings

BTO-22 razor tape, concertina coils, barbed wire and angled barbed arms are available as toppings for high-security perimeters, specified per site risk assessment.

Technical specification — 358 system

Panel class358 / anti-climb · 2D 4/6/4 · mesh ≈ 76.2 × 12.7 mm
Manufacturer certificationsISO 9001 / 14001 / 45001 · CE on request
Project posts / fixings60 × 80 × 2.5 × 3600 mm + flat bar 60 × 5 + angle 40 × 40 × 4 + BTO-22
CoatingHot-dip galvanised, HDG EN ISO 1461
GatesPedestrian · swing · sliding
Optional toppingBTO-22 razor tape
BTI / customsBTI application submitted / pending national reference (not approved) · CN 7308 90 98 90 · CPV 45340000

Heights, post spacing and gate leaves are configured per project drawing. Other product families are specified on the same basis. Prices are quoted per project — no public price list.

Tell us about the perimeter and which system you need. We reply with a specification-led quotation — never a generic price list.

Request project quote